Implementing Agency
National Power Corporation (NPC)
Project Description
The project includes a below ground powerhouse with three (3) 115-megawatt turbine-generators and a nearly six-mile-long 230-kilowatt transmission line. Other facilities of the project include a concrete chute spillway to handle excess water, a power tunnel/penstock for routing water from the reservoir to the power plant and an electrical substation. In addition to the dam’s production of non-polluting hydroelectric power, its five-square-mile reservoir serves as a settling basin that will entrap sediment above the dam, thus improving water quality below the dam.
The Operator shall be responsible for the design, construction, installation, completion, testing and commissioning of the Power Station.
Estimated Project Cost During Approval
Php 57.05 Billion
Procurement Mode
Solicited
Contractual Scheme
Build-Operate-Transfer (BOT)
Contract Term
25 years
Implementation Mode
National
Region
Sector
Power
Private Proponent
San Roque Power Corporation
Status
Operational