Metro Manila Skyway Stage 1 & 2 Project

Project Brief
Project Description

The Metro Manila Skyway is an elevated expressway to be constructed along existing major road that will link the South Luzon Expressway and the North Luzon Expressway from Alabang, Muntinlupa to Balintawak, Caloocan City through the mid-western corridor of Metro Manila with a total length of 35 kms., more or less. When completed, it will be an alternative to EDSA as a major expressway that will link the northern and southern regions of Luzon.

MMS Stage 1 consists of the construction of an elevated 2×3 lane expressway from Buendia to Bicutan and the rehabilitation of the existing SLEX At-grade from Magallanes to Alabang.

MMS Stage 2 is a continuation of Stage 1 elevated expressway from Bicutan to Alabang over the existing alignment of the SLEX. Stage 2 extended the toll road by about 6.88 kms.

Implementing Agency

  1. Philippine National Construction Corporation (PNCC)
  2. Toll Regulatory Board

(Pursuant to the decisions of the Supreme Court in the case of Ernesto B. Francisco vs. TRB, PNCC et. al. and Strategic Alliance Development Corporation vs. Radstock Securities Limited, PNCC turned over its shares in the project to the National Government and its participation in the operation and maintenance to the private partner.)

Contractual Arrangement

Supplemental Toll Operation Agreement

Region

  • National Capital Region

Sector

Roads

Estimated Project Cost During Approval

Php 36.170 Billion

Procurement Mode

Solicited

Contract Term

30 Years

Implementation Mode

National

Private Proponent

SMC Skyway Corporation (formerly Citra Metro Manila Toll Ways Corporation)

Status

Operational

  • MS. KRISTINA ALODIA A. ARMENGOL
    Project Monitoring Officer, PPP Center
    (+632) 8709.4146 local 5203