The Operator shall be responsible for the finance, design, supply, construction, testing and operation of an approximately 440 MW geothermal Power Plant, to be installed on the Site, whose net generation shall be delivered to NPC on behalf of PNOC-EDC during the Cooperation period.
Philippine National Oil Company – Energy Development Corporation (PNOC-EDC)
Build-Operate-Transfer (BOT) ; Energy Conversion Agreement (ECA)
Power
USD 630.45 Million
Solicited
10 years
National
Ormat Inc. (USA)