The Operator shall be responsible for the finance, design, supply, construction, testing and operation of an approximately 200 MW gross geothermal Power Plant, to be installed on the Site, whose net generation shall be delivered to NPC on behalf of PNOC-EDC during the Cooperation period.
Philippine National Oil Company – Energy Development Corporation (PNOC-EDC)
Build-Operate-Transfer (BOT)
Power
Php 15.276 Billion
Solicited
10 years
National
Magma Power Company
Concluded