Camiling Water District (CWD)
The general objective of the project is primarily to attain the highest possible level of water supply service for, as far as feasibly possible, 100% of water consumers within the coverage of the joint venture area. More specifically, the· goal is to ensure sustainable and balanced water supply that will meet growing demand for the future at the least possible cost. The project is located in the concession area of Camiling Water District consisting of 61 barangays of Camiling, Tarlac, and the adjoining municipality of San Clemente, Tarlac.
To be determined
Unsolicited
Joint Venture (JV) Agreement
25 Years (2015-2040)
Environmental,Water and Sanitation
Primewater Infrastructure Corp.
Operational