The project involved the financing, design, construction, erection, testing, commissioning, operation and maintenance of a bunker-C fired diesel generating power station with Black Start Capability and the Transmission Line Facilities.
Php 3.00 Billion (USD 60.00 Million)
Solicited
Build-Own-Operate (BOO)
18 Years (1998-2016)
Power
Southern Philippines Power Corporation
Concluded