National Irrigation Administration (NIA)
The project involved the construction of a 26.27-kilometer, 6.50 meter diameter transbasin tunnel traversing Caraballo Mountains with a capacity of 80 m3/s capable of diverting at least 800 million m3 of water/year to the Pantabangan Reservoir. It also involved the construction of two (2) diversion weirs in Casecnan and Taan Rivers in Nueva Vizcaya including 80.46-kilometer access roads that connect to local municipal and provincial road networks. Two (2) generator sets were also installed generating a combined power of 150 MW and a 230kV Switchyard wherein the National Power Corporation’s (NPC) transmission lines were connected. The power produced in the plant is supplied to the Luzon Grid.
USD 675M (PhP 33,750 Million)
Unsolicited
Build-Operate and Transfer (BOT)
20 Years (2001-2021)
National
Environmental,Water and Sanitation
CE Casecnan Water and Energy Company, Inc. (CalEnergy)
Concluded.
Project turned over to NIA on December 11, 2021.