The Operator will finance, design, build, rehabilitate, upgrade, expand, commission, test, operate, maintain and manage the CBK Complex and transfer the same to NPC at the end of the cooperation period.
National Power Corporation (NPC)
Build-Rehabilitate-Operate-Transfer (BROT)
Power
Php 22.50 Billion (USD 450 Million)
Unsolicited
25 years
National
CBK Power Corporation
Operational