Department of Transportation (DOTr)
The project involves the design, building, operating and maintaining the approximately 22.5 kilometer mostly elevated Light Railway Transit (LRT) System consisting of sixteen (16) stations along circumferential road C-5 connecting the Ninoy Aquino Terminal Airport (NAIA) Terminal 3 to Quezon City, terminating at Commonwealth Avenue with possible interchange with MRT7 at Tandang Sora Station and LRT Line 2 at Aurora Station. Trains will be stabled at the depot to be built at the UP property in Diliman, Quezon City.
Php 112.26 Billion
Unsolicited
Transportation,Rail
C5 Mass Transit Corporation Limited
For approval of relevant approving bodies