The 1200 MW Ilijan Natural Gas Combined Cycle Power Plant, is a flagship project of the Philippine Government that will utilize natural gas from the Camago-Malampaya fields in Palawan. It is intended to meet the evergrowing baseland power demands of the country.
The project involved the financing, design, permitting, site survey, development, and investigation, manufacture, transport, construction, installation/erection, completion, testing, commissioning, operation, & maintenance of a 1,200 MW natural gas fired combined cycle power plant located in Barangay Ilijan, Batangas City. To ensure that the Power Station can achieve the annual Guaranteed Net Contracted Net Capacity (GNCC) of 1,200MW over the 20year cooperation period, the Power Station had a design life of 25 years, a Rated Capacity greater than 1,200MW to take care of the station service requirement, generation losses and anticipated capacity degradation.
National Power Corporation (NPC)
Build-Operate-and-Transfer (BOT)
Power
Php 48.00 Billion
Solicited
20 Years (2002-2022)
National
KEPCO Ilijan Corporation; Korea Electric Power Corporation
Project officially concluded on June 5, 2022.