National Power Corporation (NPC)
The project involved the financing, design, construction, erection, testing, commissioning, operation and maintenance of a 100 MW Bunker-C fired diesel generating power station and the Transmission Line Facilities.
Php 5.50 Billion (USD 110.00 Million)
Solicited
Build-Own-Operate (BOO)
18 Years (1997-2015)
Power
Western Mindanao Power Corporation
Concluded