San Pablo City Water District (SPCWD)
The Project includes, but shall not be limited to the finance, design, construction, drilling, and installation of production well and filtration facilities, treated water reservoir, conveyance system, metered interconnections facilities to SPCWD, security perimeter fencing, and the operation and maintenance of the constructed facilities for 25 years. Specifically, the joint venture will involve the following:
To be determined
Solicited; Two-Stage Public Bidding
Joint Venture (NEDA JV Guidelines)
25 years
Water
Under procurement