Republic of the Philippines

Public-Private Partnership Center

San Pablo City Water District Bulk Water Supply Project, Phase II – North Service Area

Project Brief
Implementing Agency

San Pablo City Water District (SPCWD)

Project Description

The Project includes, but shall not be limited to the finance, design, construction, drilling, and installation of production well and filtration facilities, treated water reservoir, conveyance system, metered interconnections facilities to SPCWD, security perimeter fencing, and the operation and maintenance of the constructed facilities for 25 years. Specifically, the joint venture will involve the following:

  • Source development which includes drilling of Production Wells or development of surface water, construction of bunkhouse and control rooms, and construction and installation of filtration and chlorination facilities, among others;
  • Construction of ground reservoir;
  • Installation of transmission and distribution lines; and,
  • Installation of flow measuring meter (“Flow Meter”) at the Delivery Point to measure the Treated Bulk Water supplied to SPCWD

Indicative Cost

To be determined

Procurement Mode

Solicited; Two-Stage Public Bidding

PPP Structure

Joint Venture (NEDA JV Guidelines)

Cooperation Period

25 years

Region

  • REGION IV-A - CALABARZON

Sector

Water

Status

Under procurement