The project calls for the design, supply, delivery, installation/erection, and operation, including civil works, testing and commissioning, of a 700 MW Coal-Fired Thermal Power Station consisting of 2 X 350 MW generating units.
National Power Corporation (NPC)
Build-Operate-Transfer (BOT)
Power
Php 44.40 Billion
Solicited
30 Years
National
Marubeni Corp., Tokyo Electric Power Corp. & TeaM Energy
Operational