Ormoc City Water Supply System Project

Project Brief
Implementing Agency

City Government of Ormoc

Project Description

The Project aims to provide a comprehensive water supply system to meet the demand for good quality and sufficient water supply, and an operation capable of providing Level III service to its service area on a 24/7 basis, i.e. continuous water service without interruption. The Project shall involve:

  • Sourcing of bulk water supply from Lake Danao and other possible sources, including the Inawasan River;
  • Construction of a water supply facility and its ancillary appurtenances, which shall include additional construction of reservoir and new pipeline from bulk water to augment interconnection of existing pipelines;
  • Establishment of clarifier and filtration gallery to improve the quality of water supply;
  • Assessment of hydropower generation potential from the Project’s water sources and its system capacity to determine the electricity requirement that will be utilized to augment the power supply needed for the operation of the Project
  • Upgrading of the 28 service areas with Level II systems to Level III system; and
  • Operations and maintenance (O&M) of the entire water supply system covered by the Project.
Investors’ Conference Materials

Key Message of Congresswoman Lucy Torres-Gomez
Investors’ Conference Brochure
Project Overview (Presented by City Administrator Vincent L. Emnas)
Ormoc City Socio-economic Facts and Figures Video

Indicative Cost

TBD

Procurement Mode

Solicited

PPP Structure

TBD

Cooperation Period

TBD

Region

  • REGION VIII - EASTERN VISAYAS

Sector

Water & Sanitation

Status

Under development

  • Kristina Azela B. Diza
    Project Development Officer, PPP Center
    (+632) 8709-4146
  • Atty. Joy Romero
    City Legal Officer, Ormoc City Government