National Power Corporation (NPC)
The project involved the engineering, supply, installation, construction, testing and commissioning on full turnkey basis of a 300 MW Combined Cycle Power Plant.
Php 17.50 Billion (USD 350.00 Million)
Solicited
Build-Transfer-and-Operate (BTO)
15 Years (1993-2008)
National
Power
Consortium of: ABB Power Generation Ltd.,; Switzerland Marubeni Corp.; KAWASAKI Heavy Industries, Ltd.; Marubeni Corporation
Concluded