Philippine National Oil Company – Energy Development Corporation (PNOC-EDC)
The Operator shall be responsible for the finance, design, supply, construction, testing and operation of an approximately 440 MW geothermal Power Plant, to be installed on the Site, whose net generation shall be delivered to NPC on behalf of PNOC-EDC during the Cooperation period.
USD 630.45 Million
Solicited
Build-Operate-Transfer (BOT) ; Energy Conversion Agreement (ECA)
10 years
Power
Ormat Inc. (USA)
Concluded