Philippine National Oil Company – Energy Development Corporation (PNOC-EDC)
The Operator shall be responsible for the finance, design, supply, construction, testing and operation of an approximately 200 MW gross geothermal Power Plant, to be installed on the Site, whose net generation shall be delivered to NPC on behalf of PNOC-EDC during the Cooperation period.
Php 15.276 Billion
Solicited
Build-Operate-Transfer (BOT)
10 years
National
Power
Magma Power Company
Concluded