Agoncillo Water District (AWD)
The general objective of the project is primarily to attain the highest possible level of water supply service for, as far as feasibly possible, 100% of water consumers within the coverage of the joint venture area. More specifically, the· goal is to ensure sustainable and balanced water supply that will meet growing demand for the future at the least possible cost. The joint venture area is the concession area of Agoncillo Water District, which includes 16 barangays presently being served and one unserved barangay.
PhP 35.52 Million
Unsolicited
Joint Venture Agreement (JVA)
25 Years (2018-2043)
Water and Sanitation
Primewater Infrastructure Corp.
Operational