Implementing Agency
Floridablanca Water District
Project Description
The general objective of the project is primarily to attain the highest possible level of water supply service for, as far as feasibly possible, 100% of water consumers within the coverage of the joint venture area. More specifically, the· goal is to ensure sustainable and balanced water supply that will meet growing demand for the future at the least possible cost. The project is located in the concession area of Floridablanca Water District consisting of 33 barangays including an adjacent barangay in the Municipality of Lubao, Pampanga.
Estimated Project Cost During Approval
Php 1.9 Billion
Procurement Mode
Unsolicited
Contractual Scheme
Joint Venture (JV) Agreement
Contract Term
25 Years
Implementation Mode
National
Region
- REGION III - CENTRAL LUZON
Sector
Environmental,Water and Sanitation
Private Proponent
Primewater Infrastructure Corp.
Status
Operational