Guagua Water District
The general objective of the project is primarily to attain the highest possible level of water supply service for, as far as feasibly possible, 100% of water consumers within the coverage of the joint venture area. More specifically, the· goal is to ensure sustainable and balanced water supply that will meet growing demand for the future at the least possible cost. The project is located in the concession area of Guagua Water District, which is comprised of 31 barangays of Guagua, Pampanga.
Php 1,554.74 Million
Unsolicited
Joint Venture (JV) Agreement
25 Years
National
Environmental,Water and Sanitation
Primewater Infrastructure Corp.
Operational