Project Brief
Implementing Agency

Meycauayan Water District (MWD)

Project Description

The general objective of the project is primarily to attain the highest possible level of water supply service for, as far as feasibly possible, 100% of water consumers within the coverage of the joint venture area. More specifically, the· goal is to ensure sustainable and balanced water supply that will meet growing demand for the future at the least possible cost. The joint venture area is the concession area of Meycauayan Water District are barangays of the City of Meycauayan.

Project Cost

Php 2,661.13 Million

Procurement Mode

Unsolicited

PPP Structure

Joint Venture (JV) Agreement

Cooperation Period

25 Years (2017-2042)

Region

  • REGION III - CENTRAL LUZON

Sector

Environmental,Water and Sanitation

Private Proponent

Primewater Infrastructure Corp.

Status

Operational