Iriga City Water District (ICWD)
The general objective of the project is primarily to attain the highest possible level of water supply service for, as far as feasibly possible, 100% of water consumers within the coverage of the joint venture area. The project is located in Iriga City. It covers the service area of Iriga City Water District. Currently, 23 out of the 36 barangays of Iriga City, Camarines Sur are being served by the project.
Php 1,787.14 Million
Unsolicited
Joint Venture (JV) Agreement
25 Years (2018-2043)
Water and Sanitation
Primewater Infrastructure Corp.
Operational