Project Description
The Taguig Integrated Terminal Exchange Project (ITX) (formerly South Terminal of the Integrated Transport System) project will be constructed within a site area of 4.7 hectares. It will connect passengers coming from the Laguna/Batangas side to other transport systems such as the future North-South Commuter Railway project (currently the Philippine National Railways), city bus, taxi, and other public utility vehicles that are serving inner Metro Manila. The project will include passenger terminal buildings, arrival and departure bays, public information systems, ticketing and baggage handling facilities, and park-ride facilities.
The private partner will undertake the design, construction, and financing of the ITS South Terminal as well as the operation and maintenance of the whole facility. The concessionaire can also undertake commercial development and collect revenues generated from the same.
Implementing Agency
Department of Transportation (DOTr)
Contractual Arrangement
Build-Transfer-and-Operate (BTO)
Region
Sector
Transportation,Transport Terminal
Estimated Project Cost During Approval
PHP 5.20 Billion
Procurement Mode
Solicited Mode
Contract Term
35 years inclusive of construction period
Implementation Mode
National
Private Proponent
ARCA South Integrated Terminal Incorporated (ASITI); Ayala Land Inc.
Status
Pre-construction activities; ongoing finalization of the traffic management plan and detailed engineering design.