Department of Transporation (DOTr)
The Project involves the construction/development of approximately 27-kilometer rail transit system composed of the following:
1. Cebu Central Line, a 17.7-kilometer elevated monorail transit system with 14 stations;
2. Cebu Airport Line, a 9.3-kilometer elevated monorail transit system six (6) stations; and
3. A 5-hectare depot facility to be located close to the Mactan-Cebu International Airport (MCIA).
Php 77.57 Billion
Unsolicited
TBD
TBD
Transportation,Rail
Udenna Infrastructure Corporation
For approval of relevant government bodies