National Power Corporation (NPC)
The Operator will finance, design, build, rehabilitate, upgrade, expand, commission, test, operate, maintain and manage the CBK Complex and transfer the same to NPC at the end of the cooperation period.
USD 450.00 Million
Unsolicited
Build-Rehabilitate-Operate-Transfer (BROT)
25 years (2001-2026)
Power
CBK Power Corporation
Operational