National Power Corporation (NPC)
The Operator will finance, design, build, rehabilitate, upgrade, expand, commission, test, operate, maintain and manage the CBK Complex and transfer the same to NPC at the end of the cooperation period.
Php 22.50 Billion (USD 450 Million)
Unsolicited
Build-Rehabilitate-Operate-Transfer (BROT)
25 years
National
Power
CBK Power Corporation
Operational