Implementing Agency
Metropolitan Waterworks and Sewerage System (MWSS)
Project Description
The project will provide treated bulk water to the various water districts (WDs) of Bulacan to help meet the increasing water demand of its consumers, expand its current service area coverage and increase the households served. The private partner will undertake the financing, detailed design and construction, and maintenance of conveyance facilities, treatment facilities and water source.
The project will include the construction of various components, such as:
a) Water Source/s;
b) Aqueduct Interconnection, Intake and Lift Station for raw water abstraction;
c) Water Treatment Plant complete with support buildings and structures, treated water reservoir, including Sludge Treatment Facility;
d) Raw and Treated Water conveyance facilities complete with necessary appurtenances;
e) Facilities for interconnection with the WDs;
f) Bridge, Culvert, and River Crossings;
g) SCADA system;
h) Booster Pump Stations;
i) Security Perimeter Fencing;
j) Inventory of Materials and Vehicles; and
k) Access Road and Pipe Bridge Support.
Estimated Project Cost During Approval
PhP 24.41 Billion
Procurement Mode
Solicited
Contractual Scheme
Build-Operate-and-Transfer (BOT)
Contract Term
30 years (inclusive of construction)
Implementation Mode
National
Region
- REGION III - CENTRAL LUZON
Sector
Water & Sanitation
Project Proponent
Luzon Clean Water Development Corporation (LCWDC)
Consortium Members: San Miguel Holdings Inc. and Korea Water Resources Corporation
Status
Ongoing operations of Stage 1 and Stage 2 since January 24, 2019 and April 25, 2019 respectively.
Compliance to Key Performance Indicators for December 2023:
- KPI 1 - Availability of Supply: 114.88% Compliance (supply of treated bulk water is above the required contracted volume)
- KPI 2 – Water Quality: 100% Compliance
- KPI 3 – Pressure: 100% Compliance
- KPI 4 – Service Coverage: 100% Compliance
- KPI 5 – Non-Revenue Water (NRW): 100% Compliance (allowable NRW is up to 5%; for December 2023, 3.70% NRW was recorded).