Republic of the Philippines

Public-Private Partnership Center

Cavite-Laguna Expressway (CALAX)

Project Brief

CALAX roadway construction photos
CALAX viaduct construction photos
CALAX viaduct construction photo-1
CALAX viaduct construction photo-2
CALAX viaduct construction photo-3
CALAX viaduct construction photo-4
CALAX bridge construction photo
CALAX bridge construction photo
CALAX bridge construction photo-3
CALAX bridge construction photo-4
CALAX roadway construction photos
CALAX viaduct construction photos
CALAX viaduct construction photo-1
CALAX viaduct construction photo-2
CALAX viaduct construction photo-3
CALAX viaduct construction photo-4
CALAX bridge construction photo
CALAX bridge construction photo
CALAX bridge construction photo-3
CALAX bridge construction photo-4
CALAX roadway construction photos
CALAX viaduct construction photos

Implementing Agency

Department of Public Works and Highways (DPWH)

Project Description

The provinces of Cavite and Laguna are growing industrial and commercial centers in the Southern Tagalog Region. This, however, is causing traffic congestion in major road networks in the area particularly the Governor’s Drive, Aguinaldo Highway, and Sta. Rosa-Tagaytay Road. The proposed expressway project aims to provide faster, safer, more comfortable and reliable route between Bacoor and Kawit, Cavite areas, and the Laguna and South Luzon Expressway (SLEX) areas; thus enhancing trade and socio-economic activities around them.

The Cavite-Laguna Expressway (CALAX) involves the financing, design and construction, operation and maintenance of the entire 4-lane, 44.63 km closed-system tolled expressway connecting CAVITEX and SLEX. The Project will start from the CAVITEX in Kawit, Cavite and end at the SLEX-Mamplasan Interchange in Biñan, Laguna. The Project will have interchanges in 9 locations, namely: Kawit, Daang Hari, Governor’s Drive, Aguinaldo Highway, Silang, Sta. Rosa-Tagaytay, Laguna Blvd., Technopark, and a Toll Barrier before SLEX.

Project Cost

PHP 35.43 Billion *
*Project cost does not include the approved minimum bid price amounting to PhP 20.105 billion

Procurement Mode

Solicited

PPP Structure

Build-Transfer-and-Operate (BTO)

Cooperation Period

35 years inclusive of design and construction

Region

  • REGION IV-A - CALABARZON

Sector

Road

Private Proponent

MPCALA Holdings , Incorporated

Toll Operation Permit (TOP) was issued to MPCALA Holdings, Inc. on February 7, 2020, and toll collection commenced on February 11, 2020 for the first kilometers of the Laguna segment.

As of April 13, 2020, 73.4% complete for the Laguna Segment only.

Construction activities resumed on May 26, 2020 in compliance with DPWH DO No. 39, series of 2020. Toll operation for the first 10 kilometers of the Laguna segment is still ongoing.

List of Bidders

SECOND BIDDING

Prospective Bidders

  1. Metro Pacific Tollways Development Corporation
  2. Optimal Infrastructure (San Miguel Corporation)
  3. Reyes Tacandong & Co.
  4. Gatmaytan Yap Patacsil Gutierrez & Protacio Law Office

Prospective Bidders who submitted Bid Documents 

  1. MPCALA Holdings (Philippines)
  2. San Miguel Holdings (Philippines)

 

FIRST BIDDING

Prospective Bidders

1. San Miguel Corporation
2. Korea Expressway Corporation
3. Alloy MTD Philippines Inc.
4. Macquarie Infrastructure Holdings (Philippines) Pte. Limited
5. Megawide Engineering Excellence
6. Leighton Contractors (Philippines), Inc.
7. Makati Development Corporation
8. AC Infrastructure Holdings Corporation
9. EGIS Projects Developer of Infrastructure & Service
10. Metro Pacific Tollways Development Corporation
11. Aboitizland, Inc.
12. Tokwing Construction Corporation/STX Enterprises (J.V.)
13. E.F.C. Enterprises
14. M/s IL & FS Transportation Networks Limited (ITNL)
15. L & T Infrastructure Development Projects Limited
16. C.M. Pancho Construction, Inc.
17. Bouygues Travaux Publics
18. Pacific Concrete/China Harbor

Prospective Bidders who submitted PQ Documents

1. MTD Capital Bhd
2. Team Orion
3. Metro Pacific
4. Optimal Infrastructure Development Inc. (San Miguel Corporation)

Prequalified Bidders

1. MTD Capital Bhd
2. Team Orion
3. Metro Pacific
4. Optimal Infrastructure Development Inc. (San Miguel Corporation)

Bidders

1. MTD Capital Bhd
2. MPCALA Holdings (Metro Pacific Investments Corporation)
3. Optimal Infrastructure Development Inc. ( San Miguel Corporation )
4. Team Orion (Ayala Corporation, Aboitiz Land, Inc., Macquarie Infrastructure Holdings (Philippines) Pte. Limited)

Winning Bidder

MPCALA Holdings (Metro Pacific Investments Corporation)

  • MR. RONALD M. MANGILIN
    Project Monitoring Officer, PPP Center
    (+632) 8709.4146 local 5205