List of PPP Projects

Status of PPP Projects
as of April 10, 2014

PPP Projects Pipeline ChartPPP Projects Chart

View/Download PPP Brochure – February 2014 (PDF, 4MB)


Awarded Projects



Projects with Live Bidding


Prospective bidders conduct due diligence in preparing their prequalification documents (during the prequalification stage) or bidding documents (during the bidding stage). This stage also involves government’s evaluation pf bids submitted by the qualified bidder(s).

For Bid Submission
♦ Cavite-Laguna Expressway (CALAX)
LRT Line 1 Cavite Extension and O & M 
Integrated Transport System (ITS)-Southwest Terminal Project*


NEDA Board-Approved/ LDC-Approved Projects


 Bulacan Bulk Water Supply Project*
♦ Integrated Transport System (ITS)-South Terminal Project

For Evaluation and/or Approval of Relevant Government Bodies



For Finalization of Project Structure


PPP structure (scheme/modality, etc) is being finalized by the implementing agency based on pre-investment studies conducted.

Davao Sasa Port
Regional Prison Facilities through PPP* (DOJ)


Projects with On-going Studies


Pre-investment studies are currently being conducted. This includes business case, pre-feasibility, and/or feasibility studies.

Operation & Maintenance of the Puerto Princesa Airport (DOTC)
Operation and Maintenance of the Iloilo Airport(DOTC)*
Operation and Maintenance of the Davao Airport(DOTC)*
Operation and Maintenance of the Bacolod Airport(DOTC)*
Integrated Luzon Railway Project * (DOTC)
Mass Transit System Loop (MTS) Project (DOTC)
Motor Vehicle Inspection System (DOTC)
LRT 1 Extension to Dasmarinas Project* (DOTC)
Central Luzon Link Expressway – Phase II (DPWH)
♦ Improvement and Operation & Maintenance of Kennon Road and Marcos
Highway (DPWH)
Upgrading of the San Fernando Airport Project (BCDA)*
♦ Batangas-Manila (BatMan) 1 Natural Gas Pipeline Project (PNOC)*


PDMF/Other Multilateral Agencies-Supported Projects



For Procurement of Consultants for Preparation of Pre-Investment Studies

Implementing agencies are either preparing or currently undergoing the procurement of consultants who will assist in the conduct of the project’s pre-investment studies. This may be through the PPP Center-managed Project Development and Monitoring Facility (PDMF), or other resources tapped by the implementing agency.

Modernization of the National Center for Mental Health (DOH)
♦ Plaridel Bypass Toll Road (DPWH) *
♦ Manila Bay-Pasig River-Laguna Lake Ferry System Project (DOTC)*
♦ C-5 Transport Development Project (DOTC)
♦ Trimedical Complex (including the Modernization of the Dr. Jose
Fabella Memorial Hospital Project) (DOH)
♦ Vicente Sotto MMC Modernization Project (DOH)
♦ Manila East-Mass Transport System Project (DOTC)
♦ O & M of Clark Airport (DOTC)
♦ New Cebu Container Port and Redevelopment of Existing Cebu Baseport
♦ Central Spine RORO (DOTC)

Projects under Conceptualization/Development

This list includes other projects in the pipeline currently at the earlier stages of project conceptualization and development. Implementing agencies are currently assessing the project’s level of priority, and whether it is to be undertaken using the PPP scheme.

Civil Registration System – Information Technology Project Phase II
♦ Ferry Passenger Terminal Buildings Development (DOTC)
♦ C-6 Expressway (Southeast, East and North Section) (DPWH)
♦ Philhealth Information Technology Project (DOH/Philhealth)
♦ Manila Heritage and Urban Renewal Project (DOTC/DOF)
♦ NLEX East (DPWH)
♦ Freeport Area of Bataan (FAB) Barging Facility/ Port Project (FAB)
♦ Busuanga Airport Development Project (DOTC)
♦ Clark Green City Food Processing Terminal (BCDA)
♦ NIA Irrigation Project (DA-NIA)
♦ Camarines Sur Expressway Project (DPWH)


Other Projects for Implementation


♦ NLEx-SLEx Connector Road
♦ Skyway Stage 3
♦ MRT Line-7

LGU Projects



* Approved PDMF Support
 For more inquiries, email info@ppp.gov.ph or you may call the designated Project Manager at (632) 990.0721