LRT Line 1 Cavite Extension and Operation & Maintenance

LRT Line 1 South Extension and Operation & Maintenance

The LRT Line 1 South Extension Project aims to provide rapid and reliable access to and from the densely populated residential sub-urban communities south of Manila, and the various strategic commercial, industrial, and educational districts in Metro Manila. Savings in travel time and costs will make the mobility of people and goods in the area significantly faster and less costly. The project aims to increase average weekday ridership from 560,000 to 820,000 passengers in 2015.


Project Brief


Implementing Agency:

Department of Transportation and Communications (DOTC)

Project Description:

The project involves the construction of an approximate length of 11.7 km from the terminus of the LRT Line 1 at the Baclaran Terminal, to the Niyog Station at Bacoor, Cavite; of which approximately 10.5 km will be elevated and 1.2 km will be at-grade.  The whole stretch of the integrated LRT 1 with total length of approximately 32.4 km will be operated and maintained by the private proponent.

Estimated Project Cost:

PHP 59.20 Billion | USD 1.25 Billion

Status (as of March 4, 2013) :

Bidder due diligence on-going

PPP Structure:

Extension and Operation & Maintenance

Cooperation Period:

35 years inclusive of construction

Prospective Bidders



 DMCI Holdings (DMCI-Marubeni)  
 Light Rail Manila Consortium (Ayala-MPIC)
 MTD – Samsung Consortium  
 SMC Infrastructure Consortium Inc. 

Project Documents


SPECIAL BID BULLETINS
 Special Bid Bulletin 11  (Issued 19 October 2012)
 Special Bid Bulletin 10  (Issued 18 October 2012)
 Special Bid Bulletin 09-2012  (Issued 26 September 2012)
 Special Bid Bulletin 08-2012  (Issued 20 September 2012)
 Special Bid Bulletin 07-2012  (Issued 20 September 2012)
 Special Bid Bulletin 06-2012 Part 2  (Published 13 September 2012)
 Special Bid Bulletin 06-2012 Part 1  (Published 13 September 2012)
 Special Bid Bulletin 05-2012  (Published 18 August 2012)
 Special Bid Bulletin 04-2012  (Published 18 August 2012)

 Special Bid Bulletin 03-2012  (Published  16 August 2012)
Special Bid Bulletin 02-2012  (Published  15 August 2012)
 Special Bid Bulletin 01-2012  (Published on 31 July 2012)

GENERAL BID BULLETIN
♦ General Bid Bulletin 08  (Issued 20 March 2013)
 General Bid Bulletin 07  (Issued 14 March 2013)
 General Bid Bulletin 06  (Issued 19 February 2013)
 General Bid Bulletin 05  (Issued 14 February 2013)
 General Bid Bulletin 04  (Issued 12 February 2013)
 General Bid Bulletin 03  (Issued 21 January 2013)
 General Bid Bulletin 01  (Published 03 August 2012)

OTHER PROJECT-RELATED DOCUMENTS
 Notice to Prospective Bidders (Published 03 August 2012)
♦ LRT Line 1 Extension and O & M – Investors’ Briefing/Presentation (24 July 2012)
Invitation to Pre-Qualify and Bid (Published on 04 June 2012)
Preliminary Information Memorandum (04 June 2012)


PPP Roadshow: Investors’ Briefing in UK, Spain & Japan


LRT Line 1 Extension and O & M – Presentation during the PPP Roadshow: Investors’ Briefing on Rail Projects

London, United Kingdom held on 19 July 2012

List of Attendees

1. ADRIAN SALT AND PANG LTD.
2. ARUP
3. ASSET VALUE INVESTORS
4. AXIOM CAPITAL EUROPE
5. BAKER & MCKENZIE LLP
6. BLP
7. HALCROW GROUP LIMITED
8. SCOTTIA BANK GBM
9. SERCO
10. TFI-NEWS.COM
11. THE CITY UK
12. UK-ASEAN BUSINESS COUNCIL
13. UKTI
14. WESTON WILLIAMSON


Madrid, Spain held on 23-24 July 2012

List of Attendees

1. ABENGOA
2. ACCIONA
3. AECOM
4. AEDIP
5. ALDESA TURISMO
6. ASEFABLE
7. CAF
8. CEMEX
9. CENTUNION
10. CEOE
11. CEPYME
12. DELOITTE
13. EMT
14. EUROESTUDIOS
15. FERROVIAL AGROMAN
16. GETINSA INGENIERÍA
17. GRUPO SAN JOSÉ
18. IDOM INTERNACIONAL
19. INDRA
20. INECO
21. IRIDIUM
22. INSTALACIONES INABENSA
23. METRO DE MADRID
24. OHL
25. RENFE
26. SEOPAN
27. TALGO
28. TECNIBERIA


Tokyo, Japan held on 02 August 2012

List of Attendees

1. ARISTAGORA ADVISORS CO., LTD.
2. ASHURST
3. BROOKS GROUP
4. DELOITTE TOHMATSU CONSULTING CO., LTD.
5. HIRAHARA & CO. LTD.
6. HITACHI, LTD.
7. INTERNATIONAL FINANCE CORPORATION
8. ITOCHU CORPORATION
9. ITOCHU PLANTECH INC.
10. JAPAN BANK FOR INTERNATIONAL COOPERATION
11. JAPAN CHAMBER OF COMMERCE AND INDUSTRY
12. JAPAN EXTERNAL TRADE ORGANIZATION
13. JAPAN INTERNATIONAL COOPERATION AGENCY
14. JFE ENGINEERING CORPORATION
15. KONOIKE TRANSPORT CO. LTD.
16. KYOWA EXEO CORPORATION
17. LANDTEC JAPAN, INC.
18. LEAD JAPAN
19. MARUBENI CORPORATION
20. MINISTRY OF LAND, INFRASTRUCTURE, TRANSPORT AND TOURISM
21. MITSUBISHI CORPORATION
22. MITSUI & CO., LTD.
23. MKJ INC.
24. NIIGATA TRANSYS CO., LTD.
25. OPMAC CORPORATION
26. RECYCLE ONE, INC.
27. SHMIZU CORPORATION
28. SHINKO TOSHIN
29. SOJITZ CORPORATION
30. SUMITOMO CORPORATION
31. SUNVERT
32. SYSTEM BRAIN CO., LTD.
33. TAHEIYO CEMENT CORPORATION
34. TAISEI CORPORATION
35. TEC CO., LTD.
36. THE HEAVY & CHEMICAL INDUSTRIES NEWS AGENCY
37. WHITE & CASE LLP


Contact Information


Contact Persons:

ATTY. RENE K. LIMCAOCO
Undersecretary, DOTC
(+632) 725-0204 loc. 247

ATTY. JAIME RAPHAEL FELICIANO
Assistant Secretary, DOTC
(+632) 725-0013

MR. JOHAN G. MARTINEZ
Project Manager, PPP Center
(+632) 929.9251
(+632) 990.0721 local 6106

 Download Project Profile (PDF, 163KB) and Investors’ Briefing/Presentation  (PDF, 1.2MB)

 

Adobe Acrobat Reader 10 or higher is required to view the project documents.
   This is a free program available from the Adobe web site.
  

 

Comments are closed.