Public-Private Partnership Strategic Support Fund (PPPSSF)

The PPPSSP may be used for the following purposes:

1.  Right of way acquisition and related costs (including resettlement), government counterpart to be used for the construction and other costs of a PPP project, provided these do not exceed 50% of total project cost, and other related costs for potential and actual PPP projects identified by the Department.

2.  Costs of designing, building, and otherwise delivering any part of a PPP project which government decides to retain responsibility for.  This include public infrastructure such as rural and access roads, utilities, and other support facilities required for a PPP project to be viable.

Project Development and Monitoring Facility (PDMF)

Consistent with the PDMF Guidelines, the Fund shall only be used for the following:

  1. Preparation of pre-feasibility study and feasibility study;
  2. Project structuring;
  3. Preparation of Bid Documents and Draft Contracts;
  4. Transaction Advisory;
  5. Assistance in the tendering process including bid evaluation and award;
  6. Activities to determine the feasibility and viability of the potential PPP project;
  7. Preparation of various project documents as required for approval of the NEDA-ICC and other approving bodies and;
  8. Hiring of consultants and advisors to assist the IA in various aspects of the project preparation.

  View and Download the full text of the National Budget Circular No. 538